Construction Management Software on the Cloud

In construction, Building Information Modeling (BIM) has proven to reap benefits for contractors and subcontractors mainly by improving collaboration, coordination, scope management, and at times support fabrication.

But did you know that BIM can be used to do much more?

At BlackSmithSoft we take Building Information Modeling to a whole new level and transform it to “Building with Information from Models”. Construction management has never been so visual and accurate!

BlackSmith DC was forged with the intent to integrate all your project systems, regardless of vendor, on to one user-friendly cloud platform so that you may do more with BIM. We help you extend the use of your models, schedules, take-offs and document requirements by:

  • Offering a one-stop portal to manage your project with BIM or 2D drawings as your central project data repository (PDR).
  • Linking your schedules, material information, project reporting policies, Material Take-offs (MTOs), Bill of Quantities (BoQs), checklists, and any other information you require, to the project BIM models.
  • Providing a 3D view of your schedule and packaging the “to-be-built” components into Work Weeks. Progress can be tracked and reported from the field.
  • Making data updating easy with Excel, even data in the model.
  • Empowering management and construction teams with dashboard-driven project analytics and reports. 4D reporting is built-in on all levels.

In short, BlackSmithSoft transforms project models and drawings to allow you to better plan, report and make decisions.

Our Approach

Our approach is simple – You tell us what you want to build, and our platform will help you plan the best way to build it and report it.

We first assess your project reporting requirements, BIM models and construction data ecosystem and upload them to our platform drawing relationships between the different components.

In most projects this includes:

  1. Break down the schedule to a constructable level based on project requirements, WBS, constraints and schedules. The majority of contractors prefer to break activities into “Work Weeks”.
  2. Link the BIM or drawing objects to schedule activities either by selecting the objects in the 3D model or Excel.
  3. Setup the Progressable Objects so that you collect progress from the field.
  4. Upload/link the documents you need. If you don’t have a document management system, we can deploy BIM 360 Docs.
  5. Deploy in the field (optional) and monitor progress live. You can also report PV/EV using the Cost Break Down Tree app.
  6. Create the reports and dashboards you need including 4D, skyline, tabular reports and charts.
  7. Training is continuously provided from step 1.

If you would like to try BlackSmith DC,  please do contact us.

CAD Formats

Below are some of the file formats supported in BlackSmithSoft DC. For the complete list click here.

Application Typical File Formats
Autodesk AutoCAD DWG, DXF, 3DS
Autodesk Revit DWG, DXF, DGN
Bentley MicroStation DGN, DWG, DXF, IGES, STEP
Graphisoft ArchiCAD DWG, DXF, DGN, IFC
Google SketchUp SKP, DWG, 3DS
Autodesk 3DS MAX DWG, DXF, 3DS, IGES
Universal formats IFC, SAT